无码免费一区二区三区免费播放,久久国产亚洲欧美日韩精品,国产成人羞羞爽爽影院视频网站免费,欧美日韩国产一区视频大全,国产三级在线免费观看,亚洲av永久无码精品网站,精品久久久久久2020中文字幕

Feedback

Navigation:Home  ? News  ?  Company News

The "Gas Pretreatment System" of Dongda's 6 MW Distributed Gas Power Generation Construction Project was Successfully Shipped

  • Published: 2024-01-29 15:33:00
  • Hits: 1570

          The total installed capacity of the Dongda 6 MW distributed gas power generation construction project of Shanxi Jinju coal electrification Co., Ltd. is 6.0mw, including five 1.2MW yanbach silent container type low concentration gas generating units, supporting the construction of low concentration gas transmission system, power distribution and thermal control system, waste heat utilization system, gas pretreatment system, flue gas denitrification system, etc, Five generators are connected to Yangzhuang 35kV substation through a 10KV overhead line for grid connected operation.

          Our company provides five sets of gas pretreatment systems for the project, which is located in Xida village, Zhengzhuang Town, Qinshui County, Jincheng City, Shanxi Province. The project aims to realize the comprehensive utilization of low concentration gas drainage in Dongda coal mine, reduce greenhouse gas emissions, protect the ecological environment and help achieve the goal of "double carbon".

          The 5 sets of gas pre-treatment systems provided for this project were successfully shipped within the agreed time by the user through the joint efforts of various departments in our company, overcoming various difficulties.

Tel:025-84414484 Fax:025-86647595 Address:Wenying Road No.3,Binjiang Development Zone Jiangning District,Nanjing City


      Copyright by Nanjing Carbon Recycle Biomass Energy Co.,Ltd.
林周县| 桐梓县| 临朐县| 平湖市| 左贡县| 清远市| 昌邑市| 伊春市| 翁源县| 武鸣县| 石楼县| 湄潭县| 肃北| 辽中县| 肇庆市| 泾源县| 高清| 汉寿县| 寿光市| 定日县| 团风县| 逊克县| 沈阳市| 昌黎县| 栾川县| 洛扎县| 长寿区| 翁牛特旗| 丰城市| 英吉沙县| 梁山县| 石家庄市| 钟山县| 夏津县| 明星| 阿拉善左旗| 启东市| 金湖县| 阿克| 大宁县| 张家港市|